<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Maxim Krasnov</title><link>https://maximkrasnov.com/</link><description>Maxim Krasnov, founder and CEO of Cold Energy (NCT), a maker of cooling towers and chillers in Russia. Notes on industrial and data-center cooling.</description><language>en</language><item><title>Absorption Chiller for Data Centers: Free Up 1,437 kW of Grid Power</title><link>https://maximkrasnov.com/articles/absorption-chiller-data-center-power-limit/</link><guid>https://maximkrasnov.com/articles/absorption-chiller-data-center-power-limit/</guid><pubDate>Wed, 28 Oct 2026 09:00:00 +0300</pubDate><description>A gas absorption chiller cuts a 5,000 kW data center&#x27;s cooling peak from 1,667 to 230 kW and saves RUB 67M on grid connection. Payback, PUE, Tier IV backup.</description></item><item><title>Liquid Cooling for Data Centers Without a Chiller: Water to the Chip</title><link>https://maximkrasnov.com/articles/liquid-cooling-data-center-without-chiller/</link><guid>https://maximkrasnov.com/articles/liquid-cooling-data-center-without-chiller/</guid><pubDate>Sat, 24 Oct 2026 09:00:00 +0300</pubDate><description>A 5,000 kW data center without a chiller: 1.3M kWh a year instead of 10.22M, RUB 18.9M instead of 105.2M. How a closed-circuit tower replaces the compressor.</description></item><item><title>Data Center Cooling: 5 Options for 5,000 kW and Their Annual Cost</title><link>https://maximkrasnov.com/articles/data-center-cooling-five-options/</link><guid>https://maximkrasnov.com/articles/data-center-cooling-five-options/</guid><pubDate>Tue, 20 Oct 2026 09:00:00 +0300</pubDate><description>Chillers for a 5,000 kW data center cost RUB 105.2M a year, direct-to-chip cooling RUB 18.9M. Five cooling options compared: power, gas, water, PUE, payback.</description></item><item><title>Turnkey Chiller Plant: Choosing a Single-Responsibility Contractor</title><link>https://maximkrasnov.com/articles/turnkey-chiller-plant-contractor/</link><guid>https://maximkrasnov.com/articles/turnkey-chiller-plant-contractor/</guid><pubDate>Fri, 16 Oct 2026 09:00:00 +0300</pubDate><description>A turnkey chiller plant is accepted after a 72-hour integrated test. How to pick a contractor, why piecemeal buying costs more, and 10 questions to ask.</description></item><item><title>How to Cut Industrial Cooling Costs: 8 Measures with the Numbers</title><link>https://maximkrasnov.com/articles/how-to-cut-industrial-cooling-costs/</link><guid>https://maximkrasnov.com/articles/how-to-cut-industrial-cooling-costs/</guid><pubDate>Mon, 12 Oct 2026 09:00:00 +0300</pubDate><description>Free cooling on a 1,000 kW load saves up to 1.78 million kWh a year. Eight ways to cut cooling costs: water temperature, VFDs, water, heat recovery.</description></item><item><title>3rd Cold Energy Education Session: why we bring engineers together</title><link>https://maximkrasnov.com/news/third-energia-kholoda-education-session/</link><guid>https://maximkrasnov.com/news/third-energia-kholoda-education-session/</guid><pubDate>Sat, 10 Oct 2026 09:00:00 +0300</pubDate><description>On October 2 in St. Petersburg we held the 3rd Cold Energy Education Session. This year more than 65 specialists came from Russia, Belarus and Kazakhstan…</description></item><item><title>Absorption Heat Pump: How to Recover Waste Heat from 25–50 °C Water</title><link>https://maximkrasnov.com/articles/absorption-heat-pump-waste-heat/</link><guid>https://maximkrasnov.com/articles/absorption-heat-pump-waste-heat/</guid><pubDate>Thu, 08 Oct 2026 09:00:00 +0300</pubDate><description>An absorption heat pump takes 25–50 °C water from a cooling tower, adds steam or gas and delivers 60–105 °C: 42% of heat free, a third less gas than a boiler.</description></item><item><title>Cooling Equipment Made in Russia: What Is Local, What Is Imported</title><link>https://maximkrasnov.com/articles/cooling-equipment-made-in-russia/</link><guid>https://maximkrasnov.com/articles/cooling-equipment-made-in-russia/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 +0300</pubDate><description>Since 2014 we have built cooling towers, chillers, dry coolers, pump stations and controls in Russia. What is local, what is still imported, how to check.</description></item><item><title>Chiller Total Cost of Ownership: Purchase vs 15 Years of Running</title><link>https://maximkrasnov.com/articles/chiller-total-cost-of-ownership/</link><guid>https://maximkrasnov.com/articles/chiller-total-cost-of-ownership/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 +0300</pubDate><description>A chiller is 5–15 % of what you spend on cooling in 15 years; a 1,000 kW unit burns up to RUB 26 million of power a year. How to calculate TCO.</description></item><item><title>Cooling Tower vs Dry Cooler: Which to Choose for Equipment Cooling</title><link>https://maximkrasnov.com/articles/cooling-tower-vs-dry-cooler/</link><guid>https://maximkrasnov.com/articles/cooling-tower-vs-dry-cooler/</guid><pubDate>Sat, 26 Sep 2026 09:00:00 +0300</pubDate><description>At +30 °C a cooling tower gives 26–28 °C water, a dry cooler 36–41 °C. Comparing the two on temperature, water, electricity, climate and maintenance.</description></item><item><title>Chiller Free Cooling: When the Compressor Stops and What It Saves</title><link>https://maximkrasnov.com/articles/chiller-free-cooling/</link><guid>https://maximkrasnov.com/articles/chiller-free-cooling/</guid><pubDate>Tue, 22 Sep 2026 09:00:00 +0300</pubDate><description>In Moscow the wet bulb is below 5 °C for 4,696 hours a year. Free cooling on 1,000 kW saves up to 1.78 million kWh a year. Thresholds, schemes, payback.</description></item><item><title>Trigeneration: Power, Heat and Cooling from Gas — When It Pays Off</title><link>https://maximkrasnov.com/articles/trigeneration-when-it-pays-off/</link><guid>https://maximkrasnov.com/articles/trigeneration-when-it-pays-off/</guid><pubDate>Fri, 18 Sep 2026 09:00:00 +0300</pubDate><description>Trigeneration uses 85% of the gas instead of 35–40%: a gas engine makes power, its heat warms in winter and gives cooling via an absorption chiller in summer.</description></item><item><title>How Much Water Does a Cooling Tower Use, and How to Cut Make-Up</title><link>https://maximkrasnov.com/articles/cooling-tower-water-consumption/</link><guid>https://maximkrasnov.com/articles/cooling-tower-water-consumption/</guid><pubDate>Mon, 14 Sep 2026 09:00:00 +0300</pubDate><description>A 1,000 m³/h cooling tower evaporates up to 12.6 m³/h and takes 16.8 m³/h of make-up. Calculating evaporation, drift and blowdown, and using less water.</description></item><item><title>How to Choose an Industrial Chiller: 13 Costly Mistakes</title><link>https://maximkrasnov.com/articles/how-to-choose-industrial-chiller/</link><guid>https://maximkrasnov.com/articles/how-to-choose-industrial-chiller/</guid><pubDate>Thu, 10 Sep 2026 09:00:00 +0300</pubDate><description>A 1,000 kW chiller running 24/7 burns RUB 26 million of power a year. 13 selection mistakes: capacity, climate, winter duty, controls and price.</description></item><item><title>What Is an Absorption Chiller? How It Works, When It Beats a Chiller</title><link>https://maximkrasnov.com/articles/what-is-an-absorption-chiller/</link><guid>https://maximkrasnov.com/articles/what-is-an-absorption-chiller/</guid><pubDate>Sun, 06 Sep 2026 09:00:00 +0300</pubDate><description>An absorption chiller draws 5–10 kW per 1 MW of cooling; the rest is heat from 80 °C or gas. How it works, its types, and when it beats a compressor chiller.</description></item><item><title>How to Choose an Industrial Cooling Tower: Open, Closed or Hybrid</title><link>https://maximkrasnov.com/articles/how-to-choose-industrial-cooling-tower/</link><guid>https://maximkrasnov.com/articles/how-to-choose-industrial-cooling-tower/</guid><pubDate>Wed, 02 Sep 2026 09:00:00 +0300</pubDate><description>An open cooling tower on a 1,000 m³/h loop takes up to 16.8 m³/h of make-up; a closed one keeps the loop clean. Choosing by temperature, water, climate, noise.</description></item><item><title>What Is a Chiller? How It Works, Main Parts, Layout and Types</title><link>https://maximkrasnov.com/articles/what-is-a-chiller/</link><guid>https://maximkrasnov.com/articles/what-is-a-chiller/</guid><pubDate>Mon, 31 Aug 2026 09:00:00 +0300</pubDate><description>A chiller cools water or glycol, e.g. from 12 to 7 °C, giving 2.4–6.9 kW of cooling per 1 kW of power. Main parts, the cycle step by step, layout, types.</description></item><item><title>What Is a Cooling Tower? How It Works, Explained Simply</title><link>https://maximkrasnov.com/articles/what-is-a-cooling-tower/</link><guid>https://maximkrasnov.com/articles/what-is-a-cooling-tower/</guid><pubDate>Fri, 28 Aug 2026 09:00:00 +0300</pubDate><description>A cooling tower cools water by evaporation, losing about 1% of the flow as vapor per 7 °C of cooling. How it is built, how it works, typical layouts and types.</description></item><item><title>How to cut the energy cost of data-center cooling: webinar on August 6, 2026</title><link>https://maximkrasnov.com/news/data-center-cooling-energy-webinar/</link><guid>https://maximkrasnov.com/news/data-center-cooling-energy-webinar/</guid><pubDate>Tue, 04 Aug 2026 09:00:00 +0300</pubDate><description>On August 6, 2026, I will host a free online webinar on energy-efficient cooling of data centers. We start at 11:00 Moscow time (UTC+3).</description></item><item><title>Russian Data Center Week 2026: do data centers still need chillers?</title><link>https://maximkrasnov.com/news/russian-data-center-week-2026/</link><guid>https://maximkrasnov.com/news/russian-data-center-week-2026/</guid><pubDate>Tue, 31 Mar 2026 09:00:00 +0300</pubDate><description>Russian Data Center Week, one of the main events for the data-center infrastructure market in Russia, took place in Moscow.</description></item><item><title>Russian cooling equipment at Big 5 Global in Dubai</title><link>https://maximkrasnov.com/news/big-5-global-dubai/</link><guid>https://maximkrasnov.com/news/big-5-global-dubai/</guid><pubDate>Thu, 27 Nov 2025 09:00:00 +0300</pubDate><description>From November 24 to 28, 2025, we showed Cold Energy equipment at an international trade show for the first time — Big 5 Global in Dubai. For us this is an…</description></item><item><title>Cold Energy launches Russia&#x27;s first finned tube line for closed-circuit cooling towers</title><link>https://maximkrasnov.com/news/finned-tube-line-closed-cooling-towers/</link><guid>https://maximkrasnov.com/news/finned-tube-line-closed-cooling-towers/</guid><pubDate>Thu, 20 Nov 2025 09:00:00 +0300</pubDate><description>The new line produces finned heat exchanger tubes. Fins substantially increase the heat transfer surface and make the equipment highly energy efficient.</description></item><item><title>Investment project for a new cooling equipment plant in St. Petersburg</title><link>https://maximkrasnov.com/news/new-plant-investment-project/</link><guid>https://maximkrasnov.com/news/new-plant-investment-project/</guid><pubDate>Mon, 18 Aug 2025 09:00:00 +0300</pubDate><description>As a developer and manufacturer of cooling systems, we have announced a new investment project to manufacture cooling equipment for Russian industry that…</description></item></channel></rss>