Calculates annual gas, electricity and water use, capital cost, payback and the 10-year total cost of ownership. All amounts include VAT, as on the customer’s invoice. In three of the options condenser heat is rejected by a wet cooling tower: for absorption machines and centrifugal chillers a dry cooler cannot reach the required condensing temperature in summer.
—
The parameter value at which the runner-up overtakes the leader, with everything else unchanged.
Capital cost plus cumulative operating cost, with tariff escalation.
Operating cost by item: gas, electricity, water with water treatment.
Net demand of the building, the same for all four options.
Equipment list and annual resource use for each option.